23/08/2009
- Its time to drill it all together
Started off using clamps and long reach clecos to fit the
fabricated engine brackets. The gap between bracket and the
bottom strengthener is shown on the plans as 3/32" and as most
builders have done a number #40 drill is the right size and is an
easy way of maintaining the gap whilst clamping.
Once a
few holes are drilled the clamp was replaced by long reach clecos,
which were great and was glad I had bought them.

The
middle two photos show Bernard hard at work putting 'boelube' onto
each hole before I followed with the drill.
Then
as usual it was time to take it apart and deburr it all, and
finished the day by dimpling the firewall and firewall recess.

But I
am out of practise after having 3 months off and the knees are
complaining, so must call it a day...must be getting old ;-)
Next up will be